@client-favicon@@

Hardwood | Before You Buy

Knowing what to expect and being prepared will also be a lot less stressful on you, your family and your home. 

  • get a recommendation
  • installing hardwood flooring is hard, exacting – detailed
  • have it done by our seasoned professionals

Before installation day

  • relocate furniture
  • empty china cabinets and closets
  • consider removal and disposal of old floor covering
  • remove it yourself and leave 1 day before install
  • for carpet, leave tack strips and pull out staples

Trim

  • moldings and baseboards removed for additional costs
  • installers not responsible for breakage
  • painted baseboards, woodwork and paint may need retouching (your responsibility)

Sub flooring

  • may need to be prepared
  • new sub floor may be required
  • a job best left to the professionals

Door plan

  • possibility that doors may not clear the new floor and swing free
  • installers may remove doors and re-hang for an additional cost.
  • for clearance issues, arrange for a qualified carpenter to shave or cut down

Clean-up

  • waste will be produced
  • waste collected and disposed of by installers at an additional cost

Installation day

  • be home and available
  • be prepared for questions
  • presence insures the right wood is installed in the right areas
  • exact time of arrival cannot be guaranteed, only a time frame

Safety

  • installers use tools and techniques that can be hazardous
  • make sure that children and pets are out of the work area
  • follow through with a walk-through
  • prior to completion walk through to ask questions and be clear on any final details

After installation day

  • establish good ventilation for 48 to 72 hours
  • being prepared for installation day will make your life and the installers a lot easier